Muffling wells

“Advance” plugging is aimed at reducing the duration and cost of repairing wells, ensuring the fulfillment of well and well logging schedules and geological and technical measures, and oil production targets; “Gentle” killing of wells with blocking compounds minimizes the risks of negative influence of process fluids on the reservoir, reducing the duration of the HPR after well servicing.

  • Preparation, delivery of jamming solutions are carried out on specialized equipment and off-road vehicles, by qualified personnel with continuous quality control of the dispensed solution and Blocking compositions;
  • The selected blocking compositions provide the possibility of preparation both on the solution-saline unit and in the well;
  • The killing process is accompanied by continuous recording of the parameters of the injected fluid in real time.